Call For Paper Volume:4 Issue:8 Aug'2017 |

ANALYSIS OF FACTOR AFFECTING CHANGE ORDER IN CONSTRUCTION INDUSTRY USING RII METHOD

Publication Date : 27/06/2015



Author(s) :

Jaydeep N. Desai , Prof. Jayeshkumar Pitroda , Prof. Jaydev J. Bhavasar .


Volume/Issue :
Volume 2
,
Issue 6
(06 - 2015)



Abstract :

The construction process is a complex one and is associated with various changes. These changes usually lead to issuance of change order. Change orders are usually issued to cover variations in scope of work, material quantities, design errors, and unit rate changes. Change Orders in construction often have a serious impact on the quality, time, and cost of projects. Hence, Change Orders require proper analysis and action to measure the causes and effects of change orders. It is difficult and risky to manage them but it is required to manage change order in construction projects. However, past research has been done on change order are mostly qualitative and there is a lack of quantitative research. Success of construction project is affected by various causes of change order, minimizing adverse effects of change order and proper control measure of change order. This paper presents the analysis of factors affecting change order of 70 respondents from several category of construction professionals of central Gujarat region using RII method.


No. of Downloads :

2


Indexing

Web Design MymensinghPremium WordPress ThemesWeb Development

ANALYSIS OF FACTOR AFFECTING CHANGE ORDER IN CONSTRUCTION INDUSTRY USING RII METHOD

June 27, 2015